A construction controller over your bookkeeper, working in your accounting system. Monthly WIP, job costing, a month-end close you can hand to your banker and bond agent, and someone who tells you what the numbers mean. Some contractors call it a fractional controller or an outsourced controller. We call it the job. For contractors doing $5M to $50M a year.
From $4,000 a month, fixed fee, month to month. No contract.
Most contractors between $5M and $50M are run on the same setup: a good bookkeeper who pays the bills, bills the jobs and keeps the bank reconciled, and an owner who reads the bank balance because the financials come too late to be useful. Nobody is sitting between the two. That gap is the controller's job, and it shows up as:
For illustration, a $110,000–$150,000 controller salary plus employer payroll taxes and benefits costs more than the salary alone. These are illustrative assumptions, not a salary survey; actual costs depend on your market and hiring requirements.
Contractors with $5M to $50M in annual revenue who already have a bookkeeper (in-house or outsourced) and no controller, or a controller who is really a senior bookkeeper. General contractors, specialty contractors and trade contractors. Contractors who are bonded, or want to be, and need WIP-based financials prepared for their surety's review. Contractors whose banker has started asking for monthly numbers instead of annual ones.
Not a fit: contractors under $5M; contractors who want us to run payroll (we don't; we work alongside your payroll provider); contractors who want a controller on site every day; contractors with no bookkeeper at all who need the day-to-day accounting done too (see our outsourced construction accounting service, which includes it).
Your bookkeeper keeps doing what they do. We take over the parts a controller is supposed to own.
What we don't do: payroll processing, tax returns, or the daily transaction work your bookkeeper already handles. If you need the daily work done too, that's our outsourced construction accounting service.
It stays month to month. You can continue for ongoing reporting or end the engagement when the agreed work is complete.
We work in your system, so it has to be one we know. Our controllers work in QuickBooks Online, QuickBooks Desktop and Enterprise, Intuit Enterprise Suite, Sage 100 Contractor, Sage Intacct Construction, Foundation, Viewpoint Spectrum and Vista, and ComputerEase, with Procore, Buildertrend or JobTread on the project side.
QuickBooks platforms have not historically had the built-in capacity to produce the kind of complete, reconciled WIP reports commonly expected in the construction industry. Available reports vary by edition and setup. We bring the templates and review process, using your system's reports and updated project-manager estimates. If you're considering a system change, we first assess whether your existing setup can support the work.
From $4,000 a month, fixed fee, month to month. That covers the close, the WIP schedule, job costing, the management package, the monthly meeting and the reporting to your bank, bond agent and CPA. There is no hourly billing and no annual contract. If you want to stop, you stop at the end of the month.
We price it fixed on purpose. Hourly billing puts you and your accountant on opposite sides of every phone call. A fixed fee means you call when something is wrong, which is when a controller is worth having.
We quote after the first call. Four things move the number up from $4,000:
How many open jobs you run. A contractor with 15 jobs in progress at month-end is a different close than one with 60. Job count drives the WIP work and the job-cost checks more than revenue does.
How many entities. Each company that needs its own close and its own financials adds work, and intercompany balances add more.
The state of the books today. If the last clean year-end was two years ago, or the balance sheet has accounts nobody can explain, the first few months include catch-up. We scope that separately and tell you what it is before you commit.
Your bookkeeper. A strong bookkeeper who hits the close calendar keeps us at the base price. If the bookkeeping itself needs rebuilding, that is our outsourced construction accounting service, and we'll say so.
We'll tell you on the first call where you land. If a full-time controller is the better answer for you, we'll say that too.
Three ways to work with us, and the difference is how much of the accounting you want to keep in-house.
WIP preparation (from $2,500 a month): you keep your bookkeeper and your close. You send us the reports, we send back a WIP schedule and the entries to post. One deliverable, no system access. For contractors with $5 million or more in annual revenue who need WIP preparation without the broader controller service.
Construction controller services (from $4,000 a month): you keep your bookkeeper. We work in your system as the controller: the close, the WIP, job costing, the management package and the monthly meeting. This page.
Outsourced construction accounting (from $5,000 a month): we do the daily accounting too, with a construction bookkeeper and a controller on your account. Right when there is no bookkeeper, or the one you have is leaving.
Not sure which one? Book the call. We'll put you in the right one, and it's easy to move between them later.
For illustration, assume an in-house controller salary of $110,000–$150,000, plus 25% for employer payroll taxes and benefits. The recurring annual cost is $137,500–$187,500, before recruiting. Your bookkeeper stays in place under either arrangement, so the comparison below excludes that cost from both sides.
Illustrative annual cost of the controller role, in-house vs Levvigo:
These are illustrative salary and employer-cost assumptions, not a salary survey. A one-time recruiting fee equal to 20% of salary would bring the illustrative first-year in-house cost to $159,500–$217,500. Actual costs depend on your market and hiring requirements. An outsourced engagement and a full-time employee provide different capacity and availability. Compare the responsibilities, reporting deadlines, and support you need, and include any separately quoted onboarding, cleanup, software, and internal coordination costs.
When in-house is the right answer. Above $50M, or when you have several entities and a steady flow of acquisitions, you probably need a controller in the building, and a CFO over them. We'll tell you that on the call.
When it isn't. Between $5M and $50M, most contractors don't have a full-time controller's worth of work; they have a full-time controller's worth of problems that show up once a month. A fixed monthly fee covers the problems without the salary, and you're not one resignation away from no close at all.
The hybrid. Plenty of our clients keep an in-house controller and use us for WIP, job-cost analysis and the management package. See WIP preparation services.
Your account is run by a construction accountant trained and managed by Bryce Wisan, CPA, CCIFP, who spent 15 years in construction accounting, including running the construction practice at a national CPA firm, before founding Levvigo. Bryce is on the editorial committee of CFMA's Building Profits and is on the monthly call with you.
Hypothetical $18M mechanical contractor. This example uses invented figures to show the process; it is not a client case study or a promise of results. Imagine a contractor with a bookkeeper, an outside CPA at year-end and 40 open jobs, but no monthly WIP schedule. Its P&L swings by $200,000 from month to month. A controller could review job coding, obtain updated estimates from project managers, reconcile WIP to the financial statements and prepare proposed adjustments. Suppose that review identifies a $340,000 adjustment for overbillings and three jobs with declining estimated margins. The controller would explain the supporting calculations and discuss the findings with the owner and PMs. Any financing or bonding decision would remain with the lender or surety.
A bookkeeper records what happened: bills, invoices, payroll entries from your provider, bank reconciliations. A controller makes the records mean something: closes the month, prepares the WIP schedule, checks job cost against estimates, posts the entries a bookkeeper doesn't, and turns it into financials an owner, a banker and a surety can use. Most contractors under $50M have the first and not the second.
A controller who works for your company on a fixed monthly fee instead of a salary, inside your accounting system, with construction-specific experience. You get the controller's work (close, WIP, job costing, reporting) without hiring, and without a general-business controller who has never seen a WIP schedule.
Yes, in practice. "Fractional controller" and "outsourced controller" describe the same thing: a controller you don't employ full time. We use "construction controller services" because the construction part is what matters.
From $4,000 a month, or $48,000 a year, fixed fee, month to month. Open job count, number of entities and the state of the books move it up from there. We give you the number on the first call or the day after. For illustration, a $110,000–$150,000 salary plus 25% for employer payroll taxes and benefits produces a recurring in-house controller cost of $137,500–$187,500 a year, before recruiting. These are illustrative assumptions, not a salary survey. The same bookkeeper is excluded from both sides; a full-time employee and an outsourced engagement provide different capacity and availability.
Yes. Controller work happens in the system, not from exports: posting entries, fixing job-cost coding, running the close. We'll need a user login. Your bookkeeper keeps theirs and keeps doing their work.
They stay. We direct the close calendar and the cleanup, they do the daily work, and for the first time they have a controller to ask. If the bookkeeping itself needs to be rebuilt, we'll tell you, and that moves to our outsourced construction accounting service. If you already have a controller who hasn't done construction before, we can train them instead.
We start by assessing the books, identifying cleanup work and agreeing on a close calendar. Timing depends on the quality of the records, open issues and how quickly your team supplies information. We scope significant catch-up separately and agree on an expected timeline before work begins.
We prepare interim financials and WIP schedules for review against your lender's or surety's requirements, and can join a call to explain the figures. Acceptance, lending and bonding decisions remain with the recipient. Your CPA is responsible for any year-end review or audit; we support the handoff, without promising its timing or cost.
Yes. QuickBooks platforms have not historically had the built-in capacity to produce the kind of complete, reconciled WIP reports commonly expected in the construction industry. We use reports from QuickBooks Online, Desktop or Enterprise, together with current job estimates, to prepare and reconcile the schedule and proposed adjustments. We confirm the available reports and workflow for your edition and setup.
No. A CFO works on financing, strategy and the bank relationship; a controller makes sure the numbers that feed all of that are right. If you need a CFO, you need one with a working controller underneath, and that's what we are. We'll tell you if your situation calls for a CFO too.
No. We work alongside your payroll provider and your CPA. Payroll stays with a payroll company; the tax return stays with your CPA, who gets a cleaner set of books from us.
You stop at the end of the month. No contract, no notice period beyond that. Everything we've built stays in your system, because it was always in your system.
Book a 30-minute call. Tell us how the accounting runs today and what the bank or the bond agent is asking for. You'll leave the call knowing whether you need a controller, what it would cost from us, and what it would cost to hire one. No proposal deck, no follow-up sequence.
Levvigo is led by Bryce Wisan, CPA, CCIFP. Fifteen years building WIP schedules and tying them to financials for contractors — both as a construction-practice audit partner at Eide Bailly and now at Levvigo. Editorial committee, CFMA Building Profits. As heard on The ConTechCrew, Finance at the Jobsite and The Contender’s Edge.